This story is part of Planet Detroit’s Parks & Trails series, sponsored by the Ralph C. Wilson, Jr. Foundation.
Every week, Carole Hann’s walking group sets out from Ann Arbor’s Bird Hills Park for 5 to 7 miles. For years, the route had an awkward middle. Walkers crossed Huron River Drive, cut through a small patch of woods and then hit the railroad tracks.
So they crossed the tracks.
“For years, nobody really bugged you about it,” Hann said. “It’s just something that we did.”
That changed about five years ago. The tracks carry Amtrak trains between Detroit and Chicago, and crossing them on foot is illegal. Hann said the railroad started worrying about liability, and Ann Arbor police figured out the group’s routine. They knew the walkers came through on Tuesdays and roughly what time they’d reach the tracks. For a while, a patrol car would be waiting.
The ticket, she said, was “fairly expensive.” The group stopped crossing.
Now they walk through a 60-foot tunnel under the tracks. A sign at one end reads “Barton,” pointing toward Barton Nature Area. Turn around and come back, and the other end reads “Bandemer.” The tunnel links the group to Bandemer Park and several more parks beyond it.
Hann rides the trail, too. She has biked with the Ann Arbor Bicycle Touring Society for 25 to 30 years and volunteers with the Border-to-Border Trail, staffing its booth at Ann Arbor’s Bike to Work Day each May. She remembers years of riding on public roads, where drivers weren’t always happy to share. When paved paths started going in, “it was just a great relief,” she said.
She loves the views along the river and through the woods. “I find it very therapeutic,” she said. “It’s so much better than sharing the road with cars.”
“I’m not a serious bicyclist anymore,” she said. “So for me, it’s just perfect.”
A dead end at the tracks
The Border-to-Border Trail, known as the B2B, is planned as a 55-mile path across Washtenaw County, much of it following the Huron River. It’s part of Michigan’s Iron Belle Trail, the statewide route that runs from Belle Isle to Ironwood.
For a long time, the trail through Ann Arbor ran along the river and then just stopped at the railroad, said Peter Sanderson, a project manager with Washtenaw County Parks and Recreation who has worked on the B2B since 2011.
“There was no way to navigate onto Huron River Drive safely or legally,” he said.
Most people jumped the tracks. The only legal way around was up Main Street, which Sanderson called “basically an extended freeway ramp,” and then across the road with no crosswalk.
A tunnel here showed up in the county’s first feasibility study around 2002. It stalled over money. The idea of a trail linking Ann Arbor and Dexter goes back even further, to a 1984 bikeway study.
JJ Tighe of the Ralph C. Wilson, Jr. Foundation called the B2B one of the most regionally significant trails in Southeast Michigan. The tunnel, he said, “had been on the drawing board years and years and years.”
“We thought it was an opportunity to kind of lean in and help them get this one done during the foundation’s lifetime,” Tighe said.
Forty-eight hours
Feasibility work started in 2019. Design ran from 2022 to 2024, and construction began in March 2025.
The hard part was the railroad. The tracks belong to the Michigan Department of Transportation, and Amtrak runs passenger trains on them between Detroit and Chicago every day. Crews couldn’t dig under a working rail line, and the trains couldn’t simply stop whenever construction needed them to.
So the project team worked with the railroad to book one window when the line would go quiet: 48 hours. Before it opened, crews had to stage everything and be ready to go.
“Train comes through, we open the tracks up, we had 48 hours, and tracks are back in place,” Sanderson said.
During that shutdown in early June 2025, crews set 15 concrete sections, each 4 feet long and weighing 55,000 pounds. Then the rails went back down.
“That’s why it took five years of planning,” Sanderson said. “We had to orchestrate all of that so that it would go off without a hitch.”
There was other work, too. A small unnamed creek that drains Bird Hills used to flow straight toward the tunnel site, so crews rerouted it. Workers cleared mostly invasive trees and shrubs and planted more than 200 native trees, shrubs and grasses, far more than the 25 replacement trees city rules required. Inside, an art installation called “Ode to Huron” by Southeast Michigan artist Tatum Lorway is built into the tunnel lighting.
The tunnel opened with a ribbon-cutting in November 2025.

Engineering and construction for the tunnel by itself came to about $6 million, Sanderson said. A 0.6-mile stretch of trail built the year before, from Barton Dam to the tunnel site, cost about $1 million more. That way, people coming out of the tunnel had somewhere to go besides Huron River Drive.
“For rough math, it’s $7 million to do less than a mile of trail in this complicated spot,” Sanderson said.
A three-way split
The city of Ann Arbor, Washtenaw County Parks and the Huron Waterloo Pathways Initiative, a nonprofit that raises private money for the B2B, each covered a third of the cost. The city’s share came from its parks millage and the county’s from a voter-approved road and trails millage. The nonprofit’s share came from a Wilson Foundation grant of a little over $1 million plus other private donations. The city owns the tunnel.
The Huron Waterloo Pathways Initiative started in Chelsea in 2017. Its first grant came from the Wilson Foundation, which has put just under $10 million into the B2B since then, said Mackenzie Wisniewski, who has worked at the nonprofit for six years.
She said thousands of people across the county have donated, many of whom already pay for trails through their taxes.
“They’re really creating a resource that’s gonna last the community for decades to come,” Wisniewski said. “Someone like myself who has two young kids, hopefully when they’re older, they can still come back and be able to use the B2B Trail.”
The county’s trail millage lets every private dollar be matched about two to one, Sanderson said. Over the last 10 years, that has added up to about $40 million in trail construction and more than 20 miles of new trail.
Sanderson said residents have asked for this. On county parks surveys for more than 20 years, trails consistently come up near the top.
“If it’s not number one, it’s usually number two,” he said.
No regional authority, just partners
Tighe said the tunnel opens up close to 40 miles of connected regional trail. Parts of the trail through downtown Ann Arbor see heavy use, he said, rivaling Oakland County’s Clinton River Trail, and now those users can keep going north and west along the river.
No single agency could have done it. Michigan has no regional body that builds trails across city and county lines, Sanderson said.
“So it’s all built on partnerships, and it just takes time,” he said. “You have those plans and you pick off pieces of opportunity. And eventually you end up with an interconnected system.”
Tighe made a point of crediting the people behind it: Wisniewski, executive director Kiff Hamp, and Sanderson.

“He’s just an amazing guy who doesn’t always get the accolades, but he’s behind all of these amazing projects in Washtenaw County,” Tighe said.
Hann wanted the nonprofit’s staff and board recognized, too. “They constantly promote, fundraise, plan, build and, most important, maintain these important public use trails,” she said.
Sanderson sees the trail changing how people think about parks. Instead of loading the family in the car, driving to a park and driving home, people can start from their own neighborhood.
“We can ride or walk from our house, get on the trail, experience our parks, come back, and you don’t actually have to get in your car,” he said.
What’s next
Fewer than 10 miles of the B2B remain unbuilt, Wisniewski said. The goal is a fully connected trail from Chelsea through Dexter and Ann Arbor to Ypsilanti within the next decade.
The next piece runs through Barton Nature Area. Tighe walked it a few weeks ago with Hamp.
“It’s an absolutely beautiful segment of nature preserve that’s just north of Ann Arbor,” he said.
To the east, the B2B now reaches the Wayne County line near Willow Run Airport, where Van Buren Township is close to finishing connections to Lower Huron Metropark. From there, the Downriver Linked Greenways run to Lake Erie. Sanderson said almost 100 miles of trail are being stitched together.
New parks are popping up along the way, too. Broadway Park, on a reclaimed DTE Energy site, sits along the B2B near the tunnel. Chelsea just opened a downtown park on a former manufacturing site that connects to the trail, with Wilson Foundation support.
See it for yourself
Planet Detroit will host a free walk through the tunnel on Saturday, Dec. 5, at 10 a.m., led by Mackenzie Wisniewski. Meet at the Barton Dam Nature Area parking lot. The trail is flat, paved, and easy walking. It’s about 0.8 miles from the lot to just past the tunnel, so the shortest round trip is about 1.6 miles. Register here.
To learn more about the trail or donate, visit b2btrail.org.



